Jacques-Cartier bridges & Champlain
62605 – Jacques Cartier Bridge, section 7, cleaning and painting work above the deck between piers 23 and 26 (2022-2024)
62605 – Jacques Cartier Bridge, section 7, cleaning and painting work above the deck between piers 23 and 26 (2022-2024)
Eurovia Québec Grands Projets inc.
Subcontract for work on demand south of Montreal in the MTQ contract 2513-19-0201 On-demand contract for repairs to various structures in the south sector
RailTerm Inc.
MTR418988 – Railway bridge rehabilitation over Mississippi river at MP 21.00 on the Renfrew subdivision in Ontario, Canada
Ministère des Transports Québec
2503-21-0202 – Reinforcement and repair work on the beams and slab of the Île-aux-Tourtes bridge, located on Highway 40, over the Ottawa River, in the village of Senneville and the city of Vaudreuil-Dorion, outside the MRC and MRC Vaudreuil-Soulanges, electoral divisions of Jacques-Cartier and Vaudreuil
Construction Demathieu Bard Inc.
Subcontract for the installation of the PTE blocks and the permanent PTE in the MTQ contract 2503-19-0217 Repair of the St-Pierre Interchange Structures – Lot 6 – Intersection A-20 and Route 138
Ministère des Transports Québec
2503-19-0210 – Contract on demand for priority slab repair work, beams and various elements on Ile-aux-Tourtes bridge located on highway 40, above the Ouatouais river, link between Vaudreuil-Dorion city and Senneville town, Outside RCM and RCM of Vaudreuil-Soulanges, electoral districts of Vaudreuil and Jacques-Cartier.